+1 (800) 671-9662
Secure Online Shopping

12-21-2024: Same-day shipping available! Call (800) 671-9662 for more details.

FODS Trackout Control Mat Pack - Site Entrance & Exits

  • Was $3,095.00
  • Now: $2,695.00

Product Code
FODS-1100TCM
CALL FOR VOLUME PRICING!
 (800) 671-9662

  • Distributor Pricing Available Call Us!
  • Volume Discounts Buy More, Pay Less
  • Zero Sales Tax Order Online
  • Secure Shopping High Security Checkout


We are now shipping the FODS 2.0 Mat!
Please call us for more information (800) 671-9662

Trackout Control Mats - Dirt & Mud Removal Mats

Do you have issues with vehicle tracking and sediment leaving your construction site? The FODS 2.0 (Foreign Object Debris System) mat is a composite tracking control mat designed to be used on a construction entrance or exit that minimizes crossover contamination. This new solution replaces traditional rock vehicle tracking control methods!  Each mat can withstand over 1,000,000 passes and 250,000 lbs and is backed by a 3-year guarantee!

FODS mats work uniquely by deforming the tire, spreading the tire lugs apart, and depositing the mat's dirt, rock, mud, or other sediments. Tire lugs and/or treads will contact the pyramids’ various surfaces differently. As the tires roll across the mat, the pyramids will scrape, clean, deform, and wipe debris from the tires. Once the tires reach the street, they will be virtually clean from any material. 

The top surface of a FODS mat is a geometric pattern formed in the shape of pyramids. The mats are unidirectional and are meant to have staggered pyramids in the direction of travel. Each pyramid has a crush rating of 20,000 lbs! Individual mats are connected with hardware to form various configurations to fit your project!


Superior Quality - Made in the USA

Hardware box included with every pallet!

Mat Size: 12’(w) x 7’ (l) x 3 3/4” (h) (2 7/8” pyramid height)

Mat Weight: 420lbs

Pallet Size: 8 Mats

Truck-Load: 96 Mats


Picture of FODS Trackout Mats deployed for mud and dirt removal on construction site entrances and exits

Superior Benefits

Create an instant construction entrance over virtually any type of surface, including asphalt, concrete, turf, marshy area, sand, mud, even ground, uneven ground, or similar!

It will not get clogged, be an eyesore, or become embedded in soft ground.

Protects ground when placed on top of the surface, unlike conventional SCEs (Stabilized Construction Entrance)

Easily transported from site to site in minutes.

Create an easily recognizable entrance for vehicles to see day or night.

Ideal for construction, airports, government, military, mining, agriculture, forestry, renewable energy, oil and gas, telecommunications, national parks, stormwater, roads, and bridges.

FODS 2.0

Rocks

100% Solid & Uniform Construction
Easily Cleaned
Reusable and Transportable
Protects Ground Underneath
Easily Seen
Recyclable
Doesn't Become Clogged
Doesn't Absorb Chemicals and Oils
Amount of Uses 100's Once

Proprietary Design

FODS Trackout Control Mats deform tires without causing damage, making mud and debris removal more effective.

Rapid Installation

It can be set up in about 30 minutes and requires minimum maintenance.

Cost-Effective & Reusable

It can be reused numerous times to allow for more accurate job costing and estimation. FODS Trackout Mats will save you time and labor costs, can be used on any substrate, and FODS Trackout Mats help prevent worksite debris fines.

Great Durability

FODS Mats are constructed from a super-strong polymer that is durable, but also flexible.

Easily Transportable

When taking into consideration the limitations of deploying rocks, the ability to move your mats from site to site throughout the year is a game-changer.

Environmentally Friendly

These Mats do not damage the ground and can eliminate the need for remediation. At the end of its lifespan, the FODS Trackout Mat can be recycled.


Installation Guide

The site where the FODS Trackout Control System is to be placed should correspond to recommended Best Management Practices (BMP) as much as possible. The site should also meet or exceed the local jurisdiction or stormwater pollution prevention plan (SWPPP) requirements.

Call for utility location 3 business days in advance of the FODS Trackout Control System installation for the marking of underground member utilities. Call the utility notification center at 811.

Once the site is established where FODS Trackout Control System is to be placed, any excessive uneven terrain should be leveled out or removed, such as large rocks, landscaping materials, sudden abrupt changes in elevation, and similar. FODS will span and support most obstacles, but the flatter and smoother the terrain under the mats, the more efficient and safer the FODS Trackout Control System will be.


Person placing FODS tracking control mats in place

Step 1

Place the mats in the position needed.

Person adding FODS tracking control mat H brackets in place

Step 2

Add H Bracket between mats.

FODS tracking control mats connected with metal straps

Step 3

Connect mats with metal straps

Person anchoring FODS tracking control mats in place

Step 4

Anchor mats in place


Example Trackout Mat Configurations

FODS Trackout Mat Configuration Options
FODS Mats being delivered in large quantities
Unpacking FODS Mats on site
Deployed FODS Mats for Tracking Control
Closeup of FODS Mats in use

Closeup picture of the FODS Trackout Ground Mat for Tracking Control

Stabilized Construction Entrance (SCE)

12’ wide by 70’ long of appropriate aggregate. The location where SCE is to be located needs to be excavated 6” down in-depth, a geotextile erosion control fabric placed down, with aggregate placed on top. Individual jurisdictions require specifications that can increase or decrease depth, width, length, size of aggregate, and similar. After SCE removal, topsoil must be added back to the disturbed area, graded, and re-seeded.

WARNINGS

  • Caution is to be used when crossing mats with metal tracked equipment.
  • Equipment with aggressive metal tracks should not cross mats.
  • Do not drag metal equipment across mats.
  • Do not use mats for bridging.

Used with guidance for:

Stabilized Construction Access (SCA)

HCFCD Specification 02365

Stormwater TC-1 Stabilized Construction



Customers Who Viewed This Page Also Viewed


Specifications

Features
Guarantee Length 3 Years
Dimensions
Height 3 3/4” (2 7/8” pyramid height)
Length 7'
Width 12'
Weight
Per Pallet 3,440 lbs.
Per Unit 430 lbs.
Load Capacity
Per Unit 250,000lbs
Material
Type HMWPE (High Molecular Weigh Polyethylene)

Downloads


Q & A

Be the first to ask a question.

Tags: Stabilized Construction Entrance and Exit Mats, TC-1 Mat, Tracking Control, Trackout, Rocks, Mud, Debris, Dirt

Contact Us

Weekdays 9AM to 6PM

Address:

30 Industrial Rd,
Cumberland, RI 02864

Phone:

(800) 671-9662

Fax:

(877) 405-6983

Email:

Send Us An Email

Testimonials